General consulting & solutions · Est. 2016
10 years of engineering systems that keep the Philippines moving
For a decade, Wattsavers has delivered critical HVAC, fire protection, power, audiovisual, and IT systems for government agencies and businesses across the Philippines.
From supply and installation to commissioning and long-term maintenance, we deliver complete solutions built to perform.
- 10+Years of serving the people
- 150+Projects completed
- 100+Government agencies served
- PlatinumPhilGEPS Company
What we deliver
All services →Mechanical
HVAC Systems
Design-assist, supply, installation, and preventive maintenance of air conditioning and ventilation systems for offices, facilities, and critical rooms.
View scope →
Life safety
Fire Detection & Suppression
FDAS and FSUS packages engineered to code, from detection and alarm to suppression — installed, tested, and turned over with documentation.
View scope →
Electrical / Power
Generator Sets & Power
Standby and prime power gensets: sizing, supply, installation, load testing, and maintenance programs that keep facilities running.
View scope →
Audiovisual
Audiovisual Systems
Conference rooms, command centers, training halls, and public-address systems — integrated, calibrated, and supported.
View scope →
Information technology
IT Solutions & Supply
Network infrastructure, servers and workstations, structured cabling, and IT equipment supply under government procurement terms.
View scope →
Why agencies work with us
Single-contractor accountability.
One contract, one point of responsibility across mechanical, electrical, fire, AV, and IT scopes. No finger-pointing between subcontractors.
Procurement-ready.
We know the documentary requirements, timelines, and technical specifications of public bidding — and we deliver complete, compliant submissions.
We stay after turnover.
Preventive maintenance programs, response-time commitments, and parts support. The system we install in year one still runs in year five.
Selected projects
View all projects →| Client | Scope of work | Discipline |
|---|---|---|
| Office of the PresidentMalacañang, Manila | Preventive maintenance of five generator sets at the Malacañang Compound — 603 kW, 500 kW and 281 kW Cummins, 174 kW Daewoo and 500 kW Caterpillar diesel generators. | Generator sets & compressors |
| Senate of the PhilippinesPasay City | Preventive maintenance of two 900 kW Detroit Diesel generator sets (Model 7243-7406). | Generator sets & compressors |
| National Museum of the PhilippinesNationwide | Preventive maintenance of air-conditioning systems at the Regional National Museum buildings, FY 2026 — Northern Luzon, Central–Southern Luzon and MIMAROPA, Visayas and Mindanao National Museums. | Air-conditioning systems |
| Las Piñas General Hospital and Satellite Trauma CenterLas Piñas City | Preventive and corrective maintenance of 256 air-conditioning units. | Air-conditioning systems |
| Social Security SystemManila · San Fernando, La Union · San Carlos, Negros Occidental | Supply, delivery and installation of structured cabling systems for three branches. | Structured cabling & network infrastructure |
| Commission on ElectionsPalacio del Gobernador, Intramuros, Manila | Supply, delivery, installation, repair and preventive maintenance of the access-door and biometrics access control system for the Information Technology Department. | CCTV, access control & security systems |
| National Development CompanyMakati City | Human Resources Information System — design, development, testing, delivery and installation. | IT solutions & application development |
| Pag-IBIG Fund24 branches, Luzon | Supply, delivery and installation of 43-inch interactive kiosks at 24 branches — Ilocos, Pangasinan, La Union, Baguio, Metro Manila, Rizal, Laguna, Batangas, Mindoro and Quezon. | IT supply — interactive displays, kiosks & smart TVs |
153 project references across 8 disciplines on the projects page
Have a requirement or an upcoming bid?
Send us your terms of reference or technical specifications and we will return a compliant quotation.
